construction programme supervisor jobs in Aberdeenshire

Found 22 jobs
Sort by:

Quarry Operative

BREEDON GROUP LIMITED
Inverurie

About Breedon Group: Breedon Group plc is a leading vertically integrated construction materials group in Great Britain, Ireland, and the USA. We're dedicated to providing high-quality materials and services for the construction industry, with a commitment to safety, sustainability, and innovation. Joining Breedon means becoming part of a team that values excellence and is committed to making a...

View salary & More Info
an hour ago

Field Care Supervisor

Cera Care
Ellon

Position: Field Care Supervisor Reporting to: Registered Manager Contract Type: Permanent, Full Time, 37.5hrs Salary: £27,000 per annum About the role: We are looking for a passionate Field Care Supervisor to become an ambassador for Cera and an extension of our family. You'll carry out initial introductions, construct care plans, conduct client assessments, and shadow Care Workers to...

View salary & More Info
3 days ago

Electrical Site Supervisor Major Projects North · Kintore

Omexom UK
Kintore

Electrical Site Supervisor – Job Description Job Details Job Title: Electrical Site Supervisor Reporting to: Site Manager Business Unit: MPN – Kintore Phase 3 Purpose of the Position The Electrical Site Supervisor will undertake the site supervision of all Electrical Installation works. This work will be undertaken in full compliance with the construction drawings, documents and...

View salary & More Info
a day ago

Workshop Supervisor

MacGregor Industrial Supplies Ltd
Inverurie

We're looking for a practical, hands‐on Workshop Supervisor to support the day‐to‐day running of our Agricultural, Construction and Ground Care workshop in Inverurie. This role suits someone who takes real pride in their work, has a strong work ethic, and leads by example on the workshop floor. You'll be passionate about doing the job properly, supporting your team, and delivering a reliable,...

View salary & More Info
a day ago

Section Engineer

BAM UK & Ireland
Burnhaven

Building a sustainable tomorrow We have an exciting opportunity for a Section Engineer to join our team on the Eastern Green Link 2 (EGL2) project in Peterhead, Scotland. The EGL2 project is a landmark development in the UKs transition to renewable energy. It involves the creation of a 525kV, 2GW high-voltage direct current (HVDC) subsea transmission cable, connecting Peterhead, Scotland, to...

View salary & More Info
an hour ago
Hybrid

Sustainability Advisor

M Group
Inverurie

Job Description Right across infrastructure, theres a requirement to not only maintain, but also renew and reimagine. Whatever stage youre at in your career, with us youll have an opportunity to grow and develop. Delivering essential infrastructure services for life, while being safety first, and client and customer centric in a friendly, fun and respectful environment where you are encouraged...

View salary & More Info
6 hours ago

Product Support Specialist - Aberdeen 12 month fixed term contract

Stryker
Aberdeenshire

Description Product Support Specialist - Manual & Robotic - North East Scotland, Aberdeen (12 month fixed term contract - MAT Leave cover) Position Summary: To grow Stryker's Joint Replacement business by promoting Hip and Knee products to Orthopaedic Surgeons and optimizing customer service, growing existing accounts through technical expertise. The Product Support Specialist – Manual &...

View salary & More Info
3 days ago
Hybrid

Planner

Orion Group
Peterhead

Orion are working with hugely successful nation Construction & Infrastructure client, to source a Project Planner to contribute to one of the UK’s landmark energy projects, reporting directly into the Planning Manager and working alongside some of the industry’s leading professionals.This is a unique vacancy in that it requires applicants to have on site experiecnce such as a Site engineer or...

View salary & More Info
12 minutes ago

Senior Engineer

Deanston Cooper
Peterhead

Deanston Cooper's client, is a leading national civil engineering contractor operating across Scotland. Due to increased workload they have a current requirement for a Senior Engineer with previous concrete experience to work on a £10 million substation project in Peterhead. Future projects are expected in this area and accommodation can be provided.Your duties as Senior Engineer will include: *...

View salary & More Info
14 minutes ago
Hybrid

Marine Compliance Manager

Ceto Talent
Inverurie

Marine Assurance Manager – Offshore Vessels Office in Aberdeen | Hybrid working Competitive Basic Salary + Benefits Full time / Up to 50% travel / Hybrid split between office and home Ceto Talent is supporting a European ship-management and vessel operations company with headquarters in Germany and offices across the UK and Poland. The business owns and manages a fleet of offshore support...

View salary & More Info
4 hours ago

Quantity Surveyor (Civils)

Kenton Black
Peterhead

You will be responsible for preparing accurate cost estimates and budgets, producing bills of quantities, and ensuring all commercial reporting is delivered on time.

You will monitor project costs and progress, ensuring alignment with agreed budgets, contractual obligations, and programme milestones.

View salary & More Info
14 minutes ago

Quantity Surveyor

Galliford Try
Aberdeenshire

You will be capable of managing the day to day running of building projects up to approx.

You will be familiar with JCT and NEC and other contracts and experience with education and MOD frameworks would be an advantage. Analysis of tender allowancesThe measurement and valuation of works (on site and from drawings), for valuations, variations and final accounts.

View salary & More Info
3 days ago

Site Agent

BAM UK & Ireland
Burnhaven

Building a sustainable tomorrow BAM Infrastructure have an opportunity for an Agent to join our team on the Eastern Green Link 2 project (EGL2) in Peterhead, Scotland. The Eastern Green Link 2 (EGL2) project will see the creation of a 525kV, 2GW high voltage direct current (HVDC) subsea transmission cable from Peterhead in Scotland to Drax in England. BAM Infrastructure will provide the...

View salary & More Info
an hour ago

Graduate Engineer/PM

Omexom UK
Inverurie

Job description: Graduate Engineer/Project Manager Job Summary Background Omexom is a brand through which VINCI Energies undertakes it’s Transmission & Distribution activities. Omexom specialise in the design, supply, installation, maintenance and commissioning of electrical infrastructures for a varied range of electricity utility companies and renewable energy developers throughout the UK...

View salary & More Info
3 days ago

Mechanical Maintenance Engineer

BREEDON GROUP LIMITED
Inverurie

You will conduct routine maintenance, diagnosing mechanical faults, and implementing preventative and corrective maintenance programs to minimise downtime and optimise performance. Key Responsibilities Perform routine maintenance, inspections, and repairs on mechanical equipment, machinery, and systems

View salary & More Info
an hour ago
Alert me to new jobs like construction programme supervisor, Aberdeenshire
By continuing to use the website, I agree to the Terms of Use and Privacy Policy. You can tune your job alerts or unsubscribe at any time.

Site Engineer

Deanston Cooper
Peterhead

Deanston Cooper's client, a highly successful national civil engineering contractor with a large order book, have a current requirement for a Site Engineer. Projects include commercial groundworks and concrete structures for a variety of interesting building & civil engineering projects in the Peterhead area. Accommodation can be provided if required.Your duties as Site Engineer will include: *...

View salary & More Info
13 minutes ago

Hands-On Workshop Lead: Agricultural Equipment

MacGregor Industrial Supplies Ltd
Inverurie

A leading workshop solutions provider in Inverurie is seeking a Workshop Supervisor to oversee daily operations in their Agricultural, Construction, and Ground Care workshop. The ideal candidate will have supervisory experience, a passion for the industry, and a strong work ethic. Responsibilities include coordinating technician workloads, ensuring high standards, and supporting team development....

View salary & More Info
a day ago

Mechanical Fitter

BREEDON GROUP LIMITED
Inverurie

As a Quarry Fitter based at Daviot Quarry in the Highlands Region, you will enjoy working in a ‘hands on’ practical position within a busy environment alongside a close-knit group of colleagues supporting support the existing team in maintaining and repairing of the plant. You’re not someone who likes to sit back and let others do the work for you; the more proactive you are in this role, the...

View salary & More Info
an hour ago

Section Engineer

BAM UK & Ireland
Burnhaven

Building a sustainable tomorrow We have an exciting opportunity for a Section Engineer to join our team on the Eastern Green Link 2 (EGL2) project in Peterhead, Scotland. The EGL2 project is a landmark development in the UKs transition to renewable energy. It involves the creation of a 525kV, 2GW high-voltage direct current (HVDC) subsea transmission cable, connecting Peterhead, Scotland, to...

View salary & More Info
11 hours ago

Planner

Omexom UK
Inverurie

P6 Planner Omexom UK and ROI Location: Perth/Kintore, Scotland, United Kingdom About Omexom Omexom specialise in the design, supply, installation, commissioning and project management of electrical infrastructure projects for electricity utility companies and renewable energy developers throughout the UK and Ireland. Omexom is part of VINCI Energies UK & ROI, who specialise in the provision...

View salary & More Info
7 days ago
The Jobsora algorithm selects vacancies which is based on the parameters you set: position, location, salary level, type of vacancy, etc.
The more parameters you specify, the more precisely, the algorithm will select vacancies for you.
We recommend you to specify such minimum search refinements:
• Job title or company name
Menu